Construction of rockfill embankment dam with reinforced concrete face slab as Dam protection works, drained layer, high strength rockfill material and well graded selected material.
Drilling and Curtain grouting, Reinforced concrete elements for the concrete crust units, cut offs, spillway and walls.
Mechanical works including piping works, screens, valves, elbows, connections and Instrumentation.
Excavation: 50,000 m3
Earthworks: 143,000 m3
Concrete: 7,175 m3
Max Dam Height: 26m
Dam Crest Width: 6m
Dam Length: 140.07m