





Construction of overlay intersection with circle in Zarqa at A’al Albait University, of 4.5km length.
In addition to construction of a new 4‐lanes bridge with length of 500m, culverts, signs, and painting.
Excavation: 24,500m3
Fill: 287,000m3
Reinforced concrete: 50,000 m3
Drainage: 6,500 Lm
Asphalt works: 120,000m2